Shop
Zendi Ultra-Light Long Dog Lead 4 – 30m with Stainless Steel Clip
Price range: $39.00 through $69.00 Incl GST
Description
Description
Ideal for allowing your dog freedom during walks while still maintaining the security of being on a long dog lead.
Discover the ultimate in dog freedom and control with the Zendi Long Dog Lead. Designed for durability and strength, this lead allows your dog to explore while ensuring you maintain secure control. Crafted from robust 6mm UV-coated polypropylene rope, it combines exceptional resilience with a light comfortable feel. The heavy-duty construction has industrial strength back stitched joins and is complemented by high-quality stainless steel swivel clip, which provide reliability and withstand vigorous use. Whether you’re training, hiking, or enjoying a park visit, this lead ensures your dog’s safety and your peace of mind. Available in lengths ranging from 4m to 30m, it meets various needs for both everyday walks and specialized activities.
Enhance Your Dog’s Recall with Our Long Lead
Improve your dog’s recall training with the Zendi Long Dog Training Lead. This Zendi dog lead is perfect for teaching your dog to come from greater distances. It combines high-quality craftsmanship with practical functionality. Handcrafted in Australia from durable 6mm UV-coated polypropylene rope, it features robust stainless steel swivel clip and reinforced back-stitched joins for maximum strength. This lead is our stainless steel clip option to be attached to a collar or harness.
If you’re interested in an all-in-one solution that combines an adjustable slip collar and lead, check out our recall slip lead option. Additionally, our slip training collars work perfectly with our long clip leads for enhanced training sessions.
Choosing the Ideal Length for Recall Long dog Training lead
Selecting the right length for your long dog training lead is crucial. Here’s a guide to help you choose the best option:
- 4m – Ideal for Basic Recall Training: Best for beginners. It provides close control for initial training and helps correct and guide your dog easily.
- 8m+ – Suitable for Advanced Recall Training: Offers more freedom for advanced training. Perfect for larger areas and practicing recall at greater distances while maintaining control.
- 15m+ – Optimal for Distance Recall Training: Ideal for open spaces. It allows for training from longer distances, maintaining a connection while giving your dog more freedom.
Selecting the Perfect Width for Your Dog
Our long leads are available in three widths: 6mm, 12mm, and 16mm, each tailored for different needs. All our stainless steel clips are robust and suitable for large dogs, and we pair each clip with the corresponding rope size for optimal performance. Please see our other listings for the 6mm and 16mm.
- 6mm Width: Perfect for smaller dogs, offering a light yet durable solution. Despite its lightweight design, it’s robust enough for extra large dogs and is an excellent choice for extended recall leads due to its easy handling. Small but strong stainless steel swivel clip attached.
- 12mm Width: Our top-selling option, renowned for its versatility and effectiveness with all dog sizes. It strikes the perfect balance between strength and lightness, making it easy to handle even in longer recall leads. Medium size stainless steel swivel clip attached.
- 16mm Width: Perfect for medium to extra-large dogs, offering a more substantial feel for enhanced comfort in the handlers hand, especially for strong pullers. However this width can become heavy in a long recall lead. Large size stainless steel swivel clip attached.
Key Features of the long dog training lead
- Premium Durability:Â Made from high-quality UV-coated polypropylene rope with a 500kg breaking strain. Reinforced with stainless steel fittings and back-stitched joins.
- Enhanced Control: The adjustable slip collar ensures it sits high on your dog’s neck, allowing for precise corrections.
- Versatile Use:Â Great for recall training, walking, and learning new tricks. Ideal for various environments like beaches and parks.
Additional Tips
- Start with a Shorter Lead:Â Build a strong recall foundation with a shorter lead.
- Gradually Increase Distance:Â Extend the lead length as your dog improves.
- Use High-Value Rewards:Â Motivate your dog with treats and praise.
- Practice in Various Environments:Â Train in different settings for reliable recall.
- Incorporate Distractions:Â Improve focus with distractions during training.
- Maintain Consistency:Â Use consistent commands and signals.
- Ensure Proper Fit:Â Regularly check and adjust the lead and collar fit.
- Monitor Body Language: Adjust training based on your dog’s reactions.
- Incorporate Play:Â Make training fun with games.
- Practice Regularly:Â Keep the recall command fresh with frequent practice.
- Be Patient and Positive:Â Celebrate progress and build recall skills gradually.
By following these additional tips, you can enhance your dog’s recall training experience, ensuring better results and a stronger bond between you and your best mate.
Custom Orders: If you do not find the colour or length you desire, please feel free to contact us. We would be thrilled to custom-create the perfect lead tailored specifically for you.
Proven Quality:Â Zendi is a trusted brand by trainers, handlers, and dog professionals for many years.
** Please note colour may vary slightly to pictures.
Additional information
Additional information
| Weight | 0.14 kg |
|---|---|
| Total Length | 4m, 5m, 6m, 7m, 8m, 9m, 10m, 15m, 20m, 25m, 30m |
| Colour | Black, Blue (Sky), Brown, Gold, Green, Orange, Pink, Purple, Red, White, Grey, Olive Green |
You may also like…
-
Training Recall long Slip Lead and Collar 6mm (Thinnest)Price range: $39.00 through $68.00 Incl GST Select options This product has multiple variants. The options may be chosen on the product page -
Zendi ADJUSTABLE Slip Collar 12mm widePrice range: $39.00 through $41.00 Incl GST Select options This product has multiple variants. The options may be chosen on the product page -
Rugby Dog Ball Super Tough Indestructible High Bounce$22.50 Incl GST Add to cart -
Zendi Cafe Lead with clips on both endsPrice range: $46.00 through $50.00 Incl GST Select options This product has multiple variants. The options may be chosen on the product page



